DeepResource

Observing the world of renewable energy and sustainable living

Offshore Wind Turbine Production Steps

1. Digging out iron ore from the ground

2. Transportation iron ore to sea port

3. Loading iron ore onto ship

4. From ore to steel plate in blast furnace

5. From steel plate for monopile and tower

6. Seajack installation vessel picks up monopiles, tower pieces and (sometimes) nacelle and installs the complete machine at sea at a pace of at least one wind tower per day


Aeolus installation schedule Irish Sea. The Aeolus can install 4 monopiles per single load, so 6 x 4 = 24 monopile installations in 18 days.